St. Catherine Street - 2007

Print

After several meetings with the Enemalta Corporation and later also with the Water Services Corporation, works at St Catherine street commenced during Septemper 2006.

Both Corporations needed to do trenching works at the said street.  The Enemalta Corporation also had to do other trenching works at Xewkija.  Therefore an agreement was reached between the Council and the Enemalta Co. and St Catherine Street was resurfaced with hot asphalt soon after the trenches were ready.